Closing soonT-Bone Ranch Detention Pond Improvements RFP
Description: Improvements to the existing subdivision detention pond. Structural work includes the excavation and removal of approx 95 LF of existing 18" HDPE storm pipe, fabric, and concrete debris. Addition parameters feature grading, earthwork subgrade preparation, setting Type I and Type II granular bedding, and installing a new stormwater conveyance system featuring 274 CY of Type M 12" rip-rap and 252 CY of Type VH 24" rip-rap lined swales. Operational requirements encompass utility coordination, implementing temporary traffic control, construction dewatering, and final turf restoration seeding and mulching across disturbed areas.