OtherIL
Posted
Oct 29, 2026
Oct 19, 2026
YMCA Central - Youth Development Center (Request for Qualification)
To provide preconstruction and construction management services
Description: Work includes the construction of a new 75,000 SF recreation facility.
HigherEducation · AL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from The University of Alabama.
Adjacent opportunities open for bidding right now.
OtherIL
Posted
Oct 29, 2026
Oct 19, 2026
To provide preconstruction and construction management services
CityFL
Posted
Oct 9, 2026
Nov 11, 2026
DESIGN-BUILD: Provide comprehensive design and construction services for the Building Division & Associated Services Expansion of the City Hall Campus project under a firm budget and accelerated schedule, and on a progressive basis.
CityCA
Posted
Jul 24, 2026
Apr 16, 2027
Provide qualified contractors; potential projects could involve: building - general renovations; electrical - building and site; HVAC plumbing - building and site roofing painting - building interior and exterior flooring asphalt concrete pavement grinding and paving concrete - i.e Sidewalk, curb and gutter, curb ramps, cross gutters, etc. Masonry - i.e. block walls, retaining walls, etc. water system - i.e.main distribution pipes, services, valves, fire hydrants, etc. Sewer system - i.e main pipes, laterals, manholes, etc. Drainage system - i.e main pipes, laterals, catch basins, junction structures, etc; pipe rehabilitation - i.e. pipe lining
CityCA
Posted
Sep 30, 2026
Nov 4, 2026
DESIGN BUILD work consists of roof replacement includes replace deteriorated and/or obsolete roofing systems and associated components; provide a complete, durable, watertight roofing and drainage system; achieve the owner's required roofing-system service life and warranty requirements; correct existing deficiencies affecting roof performance, drainage, flashing, waterproofing, and maintainability; coordinate roofing improvements with existing rooftop mechanical, electrical, plumbing, communications, structural, photovoltaic, fall-protection, and other building systems; maintain safe and substantially uninterrupted operation of the convention center; minimize impacts to scheduled conventions, exhibitions, and events. See outside link.