Lehigh County (Water And Sewer) Authority
Special DistrictPA
Posted
Sep 10, 2026
Oct 16, 2026
Kline’s Island Wastewater Treatment Plant Main Pump House and Dewatering Improvements RFP
Main pump house and dewatering improvements.
Description: Work includes, but is not limited to, replacing the well pump, replacing both high lift pumps, replacing the bladder tanks with five new units, replacing the chlorine feed pump, replacing select piping, fittings, valves, appurtenances, insulating new piping, adding concrete to the existing bladder tank pads, preparing and painting the exterior doors and associated frame, conducting three separate temporary workarounds to ensure water service is maintained while replacing the well pump, two high lift pumps, bladder tanks, and piping as well as all materials, demolition work, equipment, labor, and incidentals required for the complete improvements to the supply, treatment, and storage for the water system.
SpecialDistrict · ME, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Lehigh County (Water And Sewer) Authority
Special DistrictPA
Posted
Sep 10, 2026
Oct 16, 2026
Main pump house and dewatering improvements.
Posted
Oct 5, 2026
Nov 5, 2026
Project will include various site and equipment upgrades at four (4) non-contiguous pump stations in the ULTMA system. Work will include demolition and replacement of existing site equipment and structures, rehabilitation of existing structures, and general site upgrades such as pavement and fencing.
Jackson County Utility Authority
Special DistrictMS
Posted
Sep 20, 2026
Oct 20, 2026
The Jackson County Utility Authority is soliciting sealed or electronic bids for the rehabilitation and capacity improvements of Pump Station 20. The work includes pump refurbishment, mechanical and electrical component replacement, civil improvements, and associated control-system upgrades, with bids requiring a five-percent bid bond. Bids are due and will be publicly opened at 10:00 a.m. local time on October 20, 2026, and official bid documents are available through Central Bidding.
Muhlenberg Township (Water And Sewer) Authority
Special DistrictPA
Posted
Oct 6, 2026
Nov 4, 2026
Pump Station Pump Replacement and Improvements Project for the Township Authority. The Work generally consists of the replacement of existing sewage pumps and motors to include new pumps with variable speed drivers, a new pump control system, replacing the emergency generator, new channel grinders, the addition of new bypass piping connections, and removal of the old generator and associated equipment. Structural improvements include roof, window, door and hatch replacement, installing a hoist, generator platform modifications, and furnishing and installation of a new air handling system. Electrical improvements include wiring, lighting, and electrical work associated with powering and controlling the new equipment.