CityFL
Posted
Sep 18, 2026
Oct 19, 2026
Sidewalk Rehabilitation Phase II RFP
Work includes 6,600 SY remove existing concrete sidewalk; 5,400 SY install 4" concrete sidewalk; 1,200 SY install 6" concrete sidewalk / driveway crossing; 5 EA ada curb ramp improvements; 50 SF detectable warning surface; 50 LF concrete curb / curb & gutter repair; 25 SY asphalt pavement restoration; 50 SY sod / landscape restoration; 10 ea tree root removal / root pruning; 25 CY unsuitable material removal and replacement. See attached file.