CountyTX
Posted
Aug 14, 2025
Oct 15, 2026
Stabilization of Road Way - *Re-Bid*
Provide stabilization of road way.
Description: 35 CY - medium/heavy rip rap; 18 CY - select crush fill; 56 SY - armor stone; 20 LF - silt fence; 1 ea - 48" apron endwall; 1 ea - connect to existing storm sewer.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyTX
Posted
Aug 14, 2025
Oct 15, 2026
Provide stabilization of road way.
OtherVT
Posted
Sep 17, 2026
Oct 20, 2026
Sustainable Woodstock is soliciting bids for streambank stabilization services, including rootwad procurement and installation, construction of reinforced soil slope, seeding, and mulching.
CityCA
Posted
May 28, 2026
Oct 14, 2026
Work consists of removal and replacement of all site amenities, concrete, landscaping and irrigation, in additional to installation of new CMU and metal fencing, electrical and concrete pathway. The roundabout improvements will include removal and replacement of concrete curb, gutter, cross gutter, ac pavement, concrete sidewalk, concrete apron, storm drain system, street lighting, slurry seal, signing and striping.
CityFL
Posted
Oct 9, 2026
Nov 12, 2026
The City is seeking a contractor to reconstruct deteriorated public streets on Avenue E and 34th Street. The prior solicitation for this project describes limerock base and asphalt pavement, sidewalks, curbs, drainage structures, water-main and sewer improvements, fire hydrants, traffic-calming devices, striping, and signage. It also includes related utility work and restoration of areas disturbed by construction.
Decision makers connected to this RFP from City of Sheboygan.