CountyTX
Posted
Oct 13, 2026
Nov 4, 2026
Garth Road Reconstruction Phase 1 RFP
Provide road reconstruction phase 1.
Description: The project will reconstruct existing roadways to allow two travel lanes, one two-way left turn lane, and bike lanes. Other work includes replacement of curb and gutter, construction of sidewalks with tree wells, LED pedestrian and street lighting, upgrade of storm drainage, joint utility trench, upgrade to watermain, upgrade of curb ramps to ADA guidelines, and modifications/upgrading of traffic signals including installation of accessible pedestrian push buttons and installation of optical fiber and connection.
City · WA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyTX
Posted
Oct 13, 2026
Nov 4, 2026
Provide road reconstruction phase 1.
CityGA
Posted
Sep 24, 2026
Oct 29, 2026
Walnut street improvement project phase 2. Phase 2 of the current project includes improvements to walnut street. Improvements include, new sidewalks, new lane patterns, two bike lanes, and crossing walks. No infrastructure improvements are proposed. All existing stormwater infrastructure, sanitary sewer infrastructure, and drinking water shall remain in place.
CityFL
Posted
Sep 24, 2026
Oct 29, 2026
Work includes construct approximately 2,540 LF of 6" PVC water main, 1,450 LF of 10" PVC/FPVC (conventional installation/directional bore) water main, fire hydrants, associated appurtenances, cutting and capping existing mains; reconnection of existing water services; connection to existing mains; and associated restoration.
Posted
Oct 7, 2026
Oct 22, 2026
Work includes approximately 4,484 SY Of sidewalk and concrete apron removal and replacement; 2,567 LF Of curb and gutter removal and replacement; 1,235 TONS of a. C. Pavement; 5,054 SY Of pavement removal; 8 catch basins; 9 storm drain manholes; 1,018 LF Of storm pipe removal and replacement; 2 load centers; 12 luminaires; 37 pedestrian luminaires; 16 planters\soil cell assemblies; and other related work.
Decision makers connected to this RFP from City of Mountlake Terrace.