East Church Street Gravity Sewer Line RFP
Work includes approx 395 LF 8" SDR26 PVC gravity sewer; 2 EA standard sewer manholes; 42 LF 14" steel casing – bore; 3 EA service connections.
Description: Furnishing all materials, labor, equipment, and tools for the complete installation of approx. 223 LF of 8" ductile iron water, 211 LF of 12" PVC gravity sewer, and 87 LF of 18" stainless steel gravity sewer. Work includes valve assemblies, connections to existing mains, pressure and disinfection testing, fittings, stream and crossing stabilizations, erosion control, sanitary sewer manholes, and all associated appurtenances.
SpecialDistrict · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTN
Posted
Sep 23, 2026
Oct 20, 2026
Work includes approx 395 LF 8" SDR26 PVC gravity sewer; 2 EA standard sewer manholes; 42 LF 14" steel casing – bore; 3 EA service connections.
Florida Keys Aqueduct Authority
Special DistrictFL
Posted
Oct 1, 2026
Nov 23, 2026
Work includes approx 2,490 LF 42" HDPE DR-11 water main by directional bore; 150 LF 36" steel water main by open cut; connection of the new 42" HDPE water main and 36" steel main to the existing 36" steel water main.
CityTN
Posted
Oct 10, 2026
Oct 29, 2026
This is a construction ITB for the Poplar Grove/Mill Creek waterline upgrade. The project covers waterlines along Poplar Grove Road, Bell Hollow Road, and Mill Creek Road; the City says the existing lines are beyond their service life and need replacement because of maintenance issues. The solicitation is advertisement-only, and bidders must purchase the full package from Engineering and submit sealed envelopes.
Special DistrictSC
Posted
Oct 2, 2026
Nov 2, 2026
Project consists of constructing a concrete liner in an existing 6-MG flow equalization basin, installing basin fill and drain piping, installing floating mixers in the basin, installing associated electrical and instrumentation and controls components, and associated site work. The force main and associated control valving to control flow to and from the basin are being constructed under a separate contract (Division II).
Decision makers connected to this RFP from Orange Water And Sewer Authority.