FederalTX
Posted
Aug 26, 2026
Oct 21, 2026
FCI Elkton - Upgrade Fire Pump
Upgrade fire pump. Upgrade of the institution's diesel fire pump control system.
Description: The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Elkton, is soliciting a firm-fixed-price construction contract to upgrade the fire pump at its facility in Lisbon, Ohio. The work includes replacing the existing diesel fire pump controller and associated components, installing new conduit and communication lines, reconnecting control circuits and sensors, integrating the system with facility automation platforms, and performing testing and commissioning. This is a 100 percent small-business set-aside contract opportunity, and quotes are to be evaluated on price, technical capability, and past performance.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalTX
Posted
Aug 26, 2026
Oct 21, 2026
Upgrade fire pump. Upgrade of the institution's diesel fire pump control system.
Newark Water & Sewer Utilities
Special DistrictNJ
Posted
Sep 24, 2026
Oct 28, 2026
Work comprises the replacement of four (4) existing pumps and motors located in Building 1 and Building 2 of the Wayne Booster Pump Station, along with associated system upgrades. In addition to pump replacement, the project includes replacement of existing piping and valves; installation of flow-straightening vaned bends on the suction side of pumps in Building 1; electrical upgrades within and outside the buildings; upgrades to instrumentation and control systems for the proposed pumps; architectural improvements to building interiors and exteriors; upgrades to pipe supports and concrete equipment pads; upgrades to heating and ventilation systems; and plumbing improvements, including the installation of new sump pumps. Most of the proposed work will occur within the existing facility buildings. Work outside the buildings includes replacement of the existing walk-in motor control center (MCC) enclosure with a new, code-compliant prefabricated walk-in MCC enclosure, along with extension of the existing concrete pad to accommodate the new enclosure. Additional site and civil work includes clearing vegetation around the facility perimeter fencing and Building 1, as well as around electrical equipment near Building 2; installation of gravel and fabric within the existing electrical equipment area outside Building 2 to inhibit vegetation growth; installation of 2-inch and 4-inch HDPE drain piping from sumps in Buildings 1 and 2 to an on-site sanitary sewer manhole; removal and replacement of the existing hatch on the valve pit located within the facility driveway; rehabilitation of existing driveway pavement; and construction of new driveway extensions at select locations throughout the site.
CityIL
Posted
Sep 18, 2026
Oct 15, 2026
Pump station generator and electrical upgrade.
CityNH
Posted
Oct 9, 2026
Nov 18, 2026
This project involves the upgrade of the Ryan Circle Sewer Pump Station, including removal of existing infrastructure and construction of a new complete pump station facility with associated equipment, electrical systems, and site improvements.
Decision makers connected to this RFP from FAO.