CityOH
Posted
-
Nov 11, 2026
Luther Avenue Sewer Project RFP
Project includes of sewer.
Description: The City of Oceanside is seeking consultant engineering services for the Mission Avenue water and sewer relocation project. The listed scope includes project management, data collection and review, a flow study, site evaluation, permitting, geotechnical services, surveying, grant assistance, environmental services, and preparation of construction documents. This is an active, single procurement for professional services—not a grant program—and responses are due October 26, 2026, at 2:00 p.m. PDT.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Oceanside.
Adjacent opportunities open for bidding right now.
CityOH
Posted
-
Nov 11, 2026
Project includes of sewer.
CityGA
Posted
-
Oct 22, 2026
Relocation of water and sanitary sewer lines for the Curtis Parkway road widening. Work includes furnishing labor, equipment, and select materials to lay 4,500 L.F. 12" DIP, 900 L.F. 8" DIP, and 200 L.F. 6" DIP with hydrant, valves, service transfers, soil stabilization, driveway reconstruction, and erosion control measures.
CityCA
Posted
-
Oct 20, 2026
Work generally consists of mobilization, traffic control, implementing a water pollution control plan, relocating approximately 174 feet of 6inch sewer, removing an existing manhole, repairing/stabilizing roadway by installing a new retaining wall, cleanup of the project area, and other items of work as shown on the plans. Work includes 50 CY (f) roadway excavation; 1 LS erosion control; 210 SF asphalt paving; 174 LF 8" hdpe sewer main - open cut; 179 LF abandon existing sewer and fill with grout. See attached file.
CityCA
Posted
Oct 8, 2026
Nov 5, 2026
Sewer main replacement project. Project will remove seven (7) manholes, construct four (4) new manholes, and replace approx. 1,100 LF of existing sewer main. project will replace the existing 8" Vitrified Clay Pipe (VCP) sewer with 10" VCP sewer at the same line and grade, thereby eliminating existing deficiencies in hydraulic capacity in this reach of sewer and providing adequate capacity for ultimate flows based on the City's Sewer Master Plan.