Engineering Services - Water Treatment Plant Improvements (Request for Qualifications)
Provide engineering services - water treatment plant improvements.
Description: Provide engineering services for design, permitting, bid phase services, and services during construction for the carlton water treatment plant backup power improvements project.
County · FL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Sarasota County.
These related opportunities are still open for bidding.
CityTX
Posted
Sep 30, 2026
Oct 28, 2026
Provide engineering services - water treatment plant improvements.
Special DistrictPA
Posted
Aug 26, 2026
Oct 28, 2026
The Nanty Glo Water Authority is soliciting construction bids for Water Treatment Plant Filtration Improvements, including a third filtration unit, a second backwash equalization tank, a precast valve vault and parallel plate settling vault, a new garage building, and related site work, demolition, and appurtenances. Bids are requested under Contracts 2026-1, 2026-2, and 2026-3 and will be received and publicly opened on October 28, 2026 at 4:00 PM local time. This is a construction procurement funded through PENNVEST, not a grant-program solicitation.
CityNC
Posted
-
Oct 28, 2026
Project consists of wtp filter no.4 includes the following work: construction of a new filter no.4 including all associated appurtenances; site grading, and erosion and sediment control, within the limits of disturbance and area of excavations required for the new filter no. 4; filter no. 4 structure, including foundation, reinforced concrete bottom slab, walls, gullet, top slab, walkways, guide railing and extending filter no. 4 bottom slab to include necessary length of bottom slab for future sedimentation basin no.4.
CityIA
Posted
-
Oct 27, 2026
Water treatment plant street improvements project, includes construction of street, driveway and sidewalk on 3rd Avenue, 2nd Avenue, Main Street and State Street involving surface removals, grading, storm sewer work, manhole replacement, subgrade preparation, modified subbase, and PCC paving as well as lighting installation and electrical system improvements, general restoration, seeding and cleanup. The work involves just under 7 blocks of reconstruction.