Posted
-
Oct 14, 2026
BA083A - MIA Skyride Structural Assessment and Design Repairs
Provide all labor, equipment and materials for the structural assessment and design repairs of the MIA skyride including: installing new top flange plates in selected steel girders; removing existing stubs and replacing with new HSS stubs at selected locations; installing storm water drain pipes up to existing roof storm drains; tightening loose bolts in the connections shown in the plans; removing and installing new metal AHU platform.
