CountyTX
Posted
Oct 13, 2026
Nov 10, 2026
Lower East Fork Laterals FRS #5 Dam Rehabilitation RFP
Work includes approx 13.6 AC clearing and grubbing; 1 LS irrigation system; 34,000 CY common excavation; 170 LF temporary fence; 40 LF 6" DIP.
Description: Work consists of: soil erosion & sedimentation control, including obtaining the sesc permit for the project; staking and layout of proposed improvements, with support and confirmation from engineer temporary water control measures as required; repair or replacement of steel radial gates including removal of existing hoist equipment and replacement with new hoist frame, cleaning and coating existing steel gates; cured-in-place lining of existing corrugated metal pipe culvert outlets within the dam; right embankment repair; grading and riprap installation along the downstream toe of the dam with bedding stone, filter sand, drainage stone and filter fabric; repair of spillway concrete including shallow and deep repairs and crack injection and route/seal; turf restoration for all areas disturbed during construction; restoration of gravel access route, if disturbed during construction, related work.
City · MI, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyTX
Posted
Oct 13, 2026
Nov 10, 2026
Work includes approx 13.6 AC clearing and grubbing; 1 LS irrigation system; 34,000 CY common excavation; 170 LF temporary fence; 40 LF 6" DIP.
CountyTX
Posted
Oct 13, 2026
Nov 10, 2026
Work includes approx 1,000 CY excavation, common; 59,820 SY topsoil; 40 LF of reinforced concrete pipe; 1,970 LF of field fence.
Posted
Oct 14, 2026
Nov 12, 2026
Project includes the installation, maintenance, and removal of erosion and sediment control measures. Installation, implementation, and coordination of traffic control plan, and removal at completion of construction. Stripping and stockpiling topsoil. Demolition of existing concrete dam and associated infrastructure. Control of surface water and dewatering of subgrades in areas of work. Excavation and placement of select fill, topsoil and seeding.
Posted
Oct 9, 2026
Nov 6, 2026
Fishtrap lake intake structure and dam rehabilitation.