Pipeline abandonment.
Description: Seeking a qualified contractor to line approx. , 1700 LF of 8" to 10" sewer main and 2,500 LF of 12" to 18" drainpipe, chemical grouting lateral sewer connections, bypass pumping for maintenance of sewer flows; 1,200 LF of sewer - cured-in-place pipe lining 8" pipe; 2,000 LF of drain - cured-in-place pipe lining 12" pipe; 8 EA of sewer - chemical sealing of lateral connections to the sewer mainline; bypass pumping for maintenance of sewer flows; heavy cleaning (as ordered by the engineer); provide all materials, equipment, labor and incidentals for the installation and testing of UV cured in-place pipe (CIPP) lining within an existing host pipe; the UVCIPP liner installation shall consist of inserting a resin-impregnated flexible tube into an existing sewer main or pipe culvert, expanding the tube out against the inner walls of the existing sewer pipe or pipe culvert, and curing the tube to form a pipe liner. See attached file.
City · NH, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Town of Salem.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Sep 17, 2026
Oct 28, 2026
Pipeline abandonment.
CityWA
Posted
-
Nov 10, 2026
Construct approx. 1,100 LF of 48", HDPE combined sewer main; 130 LF of 18" PVC, combined sewer; regulator structure addition; wet tap connection to 72" sewer and 350 LF of 8" water main and other such appurtenances, and performing all other work.
Special DistrictCA
Posted
Sep 25, 2026
Oct 16, 2026
work inlcudes replacement of approx 2,040 LF of new 8" PVC pipe; 640 LF of new 20" PVC pipe; installation of appurtenances, pavement installation, and trench pavement restoration.
Special DistrictCA
Posted
Oct 9, 2026
Oct 30, 2026
Work includes 1 LS diversion of recyclable waste materials; 1 LS sheeting, shoring, and bracing, or equivalent method; 1 LS clean and inspect existing 30" cml&c steel pipe before sliplining; 3,578 LF provide and install 24" HDPE pipe via sliplining within existing 30" cml&c pipe, disinfect and test new pipeline ; 5 EA excavate slipline insertion/receiving pit, demolish existing 30" cml&c steel pipe as required, backfill and restore surface in kind; 1 LS sta 10+00: connect to existing 30" cml&c steel watermain and install approximately 10 LF of 24" cml&c steel pipe, with 24" butterfly valve, 6" blowoff assembly, and 4" air-vac assembly, connect 24" cml&c steel pipe to 24" HDPE pipe. See outside link.