Metropolitan Washington Airports Authority
Special DistrictDC
Posted
Oct 2, 2026
Dec 3, 2026
Vehicle Gate Security Guard Booths Replacement, IAD RFP
Work includes replacement of vehicle gate security guard booths at gates 118, 127 and 141.
Description: Replacement of faulty gate valves and abatement of asbestos piping insulation.
SpecialDistrict · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Metropolitan Washington Airports Authority
Special DistrictDC
Posted
Oct 2, 2026
Dec 3, 2026
Work includes replacement of vehicle gate security guard booths at gates 118, 127 and 141.
Special DistrictNY
Posted
Sep 25, 2026
Oct 14, 2026
All gate wells and roadways listed below shall be manufactured by Bibby or approved equal and be bid as follows: 100 5 1/4" x 26" gate well top sections - round slip type with top flange - 5 1/4" x 26" top/slide Barrel section without bottom flange. 100 5 1/4" round covers for above top sections with "WATER" marked in casting of cover - 5 1/4" cover/water. 100 5 1/4" x 36" gate well bottom sections - round slip type - 5 1/4" x 36" bottom/slide. 150 5 1/4" x 12" slip type rite height modified riser - tapers to 4 1/4". 150 5 1/4" x 24" slip type rite height modified riser – tapers to 4 1/4". 40 4 1/4" x 19" roadway top sections - slip type - 4 1/4" x 19" R top/slide. 40 4 1/4" round top covers for above top sections with “WATER” marked in casting of cover - 4 1/4" cover/water. 20 4¼" roadway bottom sections - slip type open base 4 1/4" x 36" R/bottom/slide.
East Bay Municipal Utility District
Special DistrictCA
Posted
Oct 9, 2026
Oct 28, 2026
Resilient wedge gate valves for stock (alpha valves).
Special DistrictPA
Posted
Oct 8, 2026
Nov 4, 2026
Work include maintenance of orbit valves. Visually inspect valve and related parts for any indication of abnormal wear and/or damage. Any mechanical abnormality discovered will be documented and reported immediately to PGW. Vendor must obtain PGW approval prior to start of repairs. PGW requests vendor to supply quotation detailing costs to repair abnormality.
Decision makers connected to this RFP from East Longmeadow Housing Authority.