Wright Water and Sewer District / RJ-9 Well Control Building RFP
Posted
Oct 13, 2026
Nov 4, 2026
Construction of a control building for the RJ-9 well and related site work. Scope under this bid includes but it is not limited to underground water lines, drain lines and electrical conduit; site electrical work including equipment pads and installation; control building foundation, process piping, electrical and controls. Above grade building structure will be by owner.
