HVSSD - WWTP Groundwater Monitoring Well Drilling and Installation (Advertisement for Bids)
Posted
Sep 30, 2026
Oct 14, 2026
Work includes 1 LS of mobilization and demobilization; 200 sf of drill three 8" diameter borings; 30 LF of provide and install 2" diameter schedule 40 PVC well screens; 176 LF of provide and install 2" diameter schedule 40 PVC well casings; 60 LF of provide and install sand pack for 2" diameter wells (includes 5-foot bentonite pellet seal); 140 LF of provide and install bentonite seals; 3 EA of provide and install surface completions; 3 EA of retrofit/repair of existing wells; see attached file.